Kitchen Remodel Cost Calculator

Price a kitchen remodel with your own numbers. Put in the prices you were quoted (or the prices you see locally) for cabinets, countertop, appliances, flooring and labour, and this adds them up line by line so you can check a contractor's total.

Ad slot — leaderboard (AdSense)
Used for the flooring line.
Total linear feet of base + wall cabinets.
Enter your local price or the figure from your quote.
USD
Measure depth × run for each section.
Enter your local price, fabricated and installed.
USD
Use the total of the models you actually want.
USD
Enter your local price, material plus underlay.
USD
Sink, taps, tile backsplash, lighting, paint.
USD
Switch to match how your quote is written.
Use the ratio from your own quote.
Money held back for surprises behind the walls.

The values loaded on this page are neutral placeholders so the calculator shows a result — they are not market data, averages or price guidance. Real kitchen prices vary enormously by region, material grade, kitchen layout and contractor. Replace every price with a figure from your own quotes or local suppliers, and get at least three written quotes before you commit.

Ad slot — in-content (AdSense)

How to read a kitchen quote before you sign it

A kitchen quote is only comparable to another quote if both are broken down the same way. Ask every contractor to split the price into cabinets, countertop, appliances, flooring, plumbing and electrical, and labour, and to state the exact cabinet line, door style and countertop material — "custom cabinets" on one quote and "stock cabinets" on another can differ by a factor of several, and a single-page total hides that completely. Then check who supplies what: if you buy the appliances and the cabinets yourself, they should not appear in the contractor's material line at all, and any handling markup should be spelled out.

The items that blow kitchen budgets are usually the ones nobody quoted. Permits and inspections, demolition and skip or dump fees, moving a sink or gas line more than a short distance, upgrading old wiring to code once a wall is open, patching and repainting the ceiling after the old soffits come out, and the rot or mould that shows up under a dishwasher that has been leaking quietly for years. Ask in writing what happens when something unexpected is found: an hourly rate plus materials, or a change-order process with your written approval. Hold a contingency of roughly 10 to 20 percent of the total on top of the quoted price, keep it separate in your head from the budget, and treat any quote noticeably below the others as a question to ask rather than a bargain to grab.